Artificial intelligence is often described as something weightless: models in the cloud, software that scales instantly, intelligence delivered through a screen.
But the cloud is physical.
Behind every AI model sits a growing network of data centres, servers, cooling systems, transmission lines and electricity generation. And as Malaysia positions itself as one of Southeast Asia's emerging AI infrastructure hubs, the question is becoming harder to avoid:
Who will power it?
The issue is no longer whether Malaysia can attract the next data centre.
It is whether the country can build the energy system required to sustain the AI economy it is trying to attract.
And that changes the nature of the race.
The AI Economy Has an Electricity Bill
The scale of AI's physical footprint is becoming increasingly difficult to ignore.
The International Energy Agency estimated that data centres consumed around 415 TWh of electricity globally in 2024, equivalent to about 1.5% of global electricity consumption. By 2030, that figure could more than double to around 945 TWh, approaching 3% of global electricity demand. [1]
The growth is not simply coming from more conventional cloud computing. AI and accelerated computing are becoming major drivers of electricity demand as data centres deploy increasingly power-intensive servers.
And there is a paradox here.
AI is often sold as a tool for efficiency: automate processes, optimise logistics, reduce waste, make better decisions.
Yet the infrastructure required to deliver that efficiency consumes enormous amounts of energy.
The more intelligence we put into the cloud, the more physical infrastructure the cloud requires.
The IEA's more recent assessment suggests that this growth is already accelerating. Data-centre electricity consumption increased sharply in 2025, while electricity use from AI-focused data centres grew even faster. At the same time, the capital expenditure of the world's largest technology companies is increasingly being directed towards the infrastructure required to support AI. [2]
The implication is important.
AI's energy demand is not a distant consequence of future adoption.
It is becoming part of the economics of AI today.
Malaysia's 7% Problem Is Becoming a 31% Question
Malaysia has already become an important location in Southeast Asia's data-centre expansion, particularly in Johor and the wider southern Malaysia–Singapore corridor.
The numbers show why the opportunity is attractive — and why the energy question matters.
Malaysia's data centres were expected to account for around 7% of electricity consumption in 2026, equivalent to approximately 10,544 GWh. By 2035, that share could rise to 31%, or about 73,274 GWh. Over the same period, Peninsular Malaysia's peak electricity demand is projected to rise from 21.3 GW to 33.5 GW. [4]
That is not simply a data-centre story.
It is an electricity-system story.
And the physical pipeline is already substantial.
As of the first quarter of 2026, Tenaga Nasional Berhad was supplying electricity to 36 operating data centres, with planned supply of around 4.5 GW. Another 23 data-centre projects were under construction, representing maximum demand of about 3.8 GW. [5]
Malaysia's own energy-transition planning increasingly recognises that capital alone does not build a digital economy.
Reliable, resilient and sustainable electricity infrastructure is becoming a prerequisite for the country's data-centre ambitions. Large AI-focused facilities can place additional pressure on power, water and grid systems. [10]
This is where the narrative starts to change.
Malaysia is no longer simply competing to attract data centres.
It is beginning to compete on whether its energy system can support them at scale.
Then Came the Heat
The problem becomes even more interesting when climate enters the equation.
In the second week of August 2026, data centres accounted for a record 9.3% of Malaysia's electricity consumption, compared with an average of around 7% for the year.
But the increase was not driven by computing demand alone.
Temperatures were higher.
And when temperatures rise, data centres need more cooling.
That means the same AI infrastructure can consume more electricity simply because the environment around it has become hotter. [8]
This creates a feedback loop:
AI demand → data centres → electricity demand → cooling → hotter conditions → more cooling demand
The irony is uncomfortable.
The infrastructure being built to power the next generation of digital growth is operating inside a physical environment that is itself becoming more demanding.
The cloud is becoming physical.
ASEAN's Problem Is Not Just Demand. It Is Uncertainty.
There is another complication.
Nobody knows precisely how quickly AI infrastructure demand will grow.
The ASEAN Centre for Energy has highlighted the uncertainty surrounding data-centre electricity demand across the region. Future requirements depend on factors including hardware power density, AI penetration and utilisation, and power usage effectiveness (PUE). The effects can also occur at both national and local-grid levels, particularly as large AI loads become more concentrated. [3]
That uncertainty creates a difficult planning problem.
Build too much capacity too early, and governments risk stranded infrastructure or unnecessary costs.
Build too little, and infrastructure becomes the bottleneck that prevents economic growth.
This is a familiar problem in technology — except electricity infrastructure cannot be upgraded at the speed of software.
A new AI model can be deployed in months.
A major generation project, transmission line or grid upgrade can take years.
The technology clock is moving faster than the infrastructure clock.
That gap may become one of the defining constraints of Southeast Asia's AI ambitions.
The Real Race Is Not for Data Centres
This is why the conventional way of looking at the AI infrastructure race is incomplete.
The usual question is:
Which country will attract the most data centres?
A better question is:
Which country can build the system that makes those data centres sustainable?
The chain looks more like this:
ENERGY → GRID → DATA CENTRE → COMPUTE → CLOUD → ENTERPRISE → AI APPLICATIONS
Data centres sit in the middle.
They are not the beginning of the system.
They are the point where several systems collide.
Without reliable electricity, the data centre cannot operate.
Without sufficient grid capacity, electricity cannot reach it.
Without cooling, the servers cannot run efficiently.
Without sufficient compute capacity, AI applications cannot scale.
And without businesses capable of using that compute, the infrastructure risks becoming an expensive monument to technological ambition.
The AI hub is therefore not really a data-centre project.
It is an energy-system project with a data centre attached.
Renewable Energy Helps. It Does Not Solve Everything.
There is already movement towards cleaner power.
In June 2026, ib vogt and AirTrunk announced what they described as Malaysia's first renewable virtual power purchase agreement for a data centre, linked to a 29.99 MWac solar project under Malaysia's Corporate Green Power Programme. [6]
That is an important step.
But renewable generation alone does not solve the problem.
The system also needs:
- sufficient generation capacity
- transmission infrastructure
- grid flexibility
- storage
- backup generation
- efficient cooling
- demand management
- transparent energy reporting
A solar project can add clean electricity.
It cannot, by itself, guarantee that electricity is available at precisely the moment a hyperscale AI facility needs it.
That distinction matters.
Energy transition is not simply about adding renewable megawatts. It is about redesigning the system around them.
And as AI demand grows, that system will have to become more flexible, not less.
The Infrastructure Race Is Expanding
The implications extend beyond electricity generation.
As AI data centres grow, demand is spreading into the supporting infrastructure around them: power generation, transformers, grid equipment, cooling technologies and other specialised systems. The wider data-centre boom is creating a new infrastructure market alongside the AI boom itself. [7]
This creates another layer of competition.
Countries are not only competing for hyperscalers.
They are competing for:
power → equipment → land → water → connectivity → skilled workers → capital → customers
That changes the economic-development equation.
A country may offer cheap land and attractive investment incentives.
But if electricity connections take too long, transmission capacity is constrained, water becomes contested or the grid cannot absorb the additional load, the economic proposition weakens.
The AI infrastructure race therefore rewards something less visible than headline investment announcements:
execution capacity.
The Uncomfortable Question: Who Pays?
There is a question beneath all of this that is rarely discussed with enough clarity.
Who ultimately pays for the infrastructure required by the AI boom?
The data-centre operator?
The technology company?
The electricity utility?
The government?
Consumers?
Or some combination of all of them?
If large data centres require new transmission infrastructure, reserve generation, grid upgrades or additional water infrastructure, those costs do not simply disappear.
They enter the system somewhere.
And this is where the idea of an AI hub needs to be examined beyond investment figures.
A country can celebrate billions of ringgit in data-centre investment.
But the more useful question is:
How much public infrastructure is required to support that private investment, and who captures the value created?
This is not an argument against data centres.
It is an argument for better accounting of their full economic footprint.
Because an AI hub should create more than electricity demand.
It should create productivity, higher-value industries, better jobs, technology transfer and broader economic capability.
Otherwise, the country risks becoming primarily a place where other people's AI gets powered.
From Attracting Demand to Designing the System
The demand is not merely speculative.
On 8 September, Nvidia-backed Firmus announced a multi-year agreement with OpenAI to supply computing capacity from two Malaysian data centres. [9]
That matters because it shows the transition from aspiration to actual contracted AI capacity.
Malaysia is moving from asking:
Can we attract AI infrastructure?
to a more consequential question:
Can our infrastructure keep supporting the demand once it arrives?
That requires coordination across ministries, utilities, regulators, data-centre developers and technology companies.
Energy policy cannot be designed separately from digital policy.
Grid planning cannot be separated from industrial policy.
Climate resilience cannot be treated as an environmental side issue.
And data-centre development cannot be evaluated solely through investment value.
The system has become interconnected.
The AI Hub Is Really An Energy Hub
Malaysia has already won part of the race.
It has attracted data-centre investment.
It has geographic advantages.
It sits within one of Southeast Asia's most important digital corridors.
It has connectivity, industrial infrastructure and access to regional markets.
But the next stage is harder.
The question is whether Malaysia can build an energy system that is simultaneously:
Reliable.
Affordable.
Scalable.
Resilient.
Clean.
Climate-ready.
That is a much bigger challenge than building another data centre.
And it may ultimately determine whether Malaysia becomes a genuine AI economy — or simply an important physical location inside someone else's AI economy.
The AI infrastructure race is therefore not really about who builds the biggest data centre.
It is about who can build the systems underneath it.
Because the future of artificial intelligence may depend less on how intelligent the model becomes than on whether the physical world can keep supplying it.
The Alpha Takeaway
The AI race is often framed as a competition for chips, models and talent.
But beneath all three sits something much less glamorous:
energy.
The countries that benefit most from the AI economy may not simply be those that attract the biggest technology companies.
They may be the ones capable of building electricity systems that are reliable enough for AI, affordable enough for businesses, scalable enough for growth, resilient enough for climate volatility and sustainable enough for the decades ahead.
Malaysia's opportunity is therefore bigger than becoming a data-centre hub.
It is an opportunity to rethink what the infrastructure of an AI economy actually looks like.
Because an AI hub without reliable power is not an AI strategy.
It is just an ambitious building.
References:
[1] International Energy Agency. (2025, April 10). Energy and AI. https://www.iea.org/reports/energy-and-ai
[2] International Energy Agency. (2026, April 16). Key questions on energy and AI. https://www.iea.org/reports/key-questions-on-energy-and-ai
[3] ASEAN Centre for Energy. (2026, August 21). Anticipating uncertainty in data centres electricity demand. https://aebf.aseanenergy.org/publications/anticipating-uncertainty-in-data-centres-electricity-demand
[4] Bernama. (2026, July 1). Electricity consumption of data centres expected to surge to 31 pct by 2035. https://www.bernama.com/misc/rss/news.php?id=2575423
[5] Bernama. (2026, July 7). TNB supplies power to 36 data centres through 1Q 2026 – PETRA. https://www.bernama.com/en/news.php?id=2577640
[6] ib vogt. (2026, June 30). ib vogt and AirTrunk deliver Malaysia's first renewable VPPA for a data centre. https://www.ibvogt.asia/ib-vogt-and-airtrunk-deliver-malaysias-first-renewable-vppa-for-a-data-centre/
[7] Reuters. (2026, September 1). Not just Nvidia: These power and cooling firms are riding the trillion-dollar data centre boom. https://www.reuters.com/business/energy/not-just-nvidia-these-power-cooling-firms-are-riding-trillion-dollar-data-centre-boom/
[8] Reuters. (2026, September 8). Malaysia's data centres guzzling more power as temperatures soar, officials say. https://www.reuters.com/world/asia-pacific/malaysian-data-centres-guzzle-more-power-temperatures-soar-2026-09-08/
[9] Reuters. (2026, September 8). Nvidia-backed Firmus signs deal with OpenAI for Malaysia data centre capacity. https://www.reuters.com/world/asia-pacific/nvidia-backed-firmus-signs-deal-with-openai-malaysia-data-centre-capacity-2026-09-08/
[10] Ministry of Energy Transition and Water Transformation. (2026, June 4). Energy Transition Conference keynote and remarks on data-centre infrastructure, electricity and energy transition [PDF]. Government of Malaysia. https://www.petra.gov.my/uploads/content-downloads/file_20260603164558.pdf